![]() |
|
|
||||||
| Frontpage Articles Articles and discussion from the Yardlimits frontpage |
|
|
LinkBack | Thread Tools |
| The Following 6 Users Say Thank You to SwitchBender For This Useful Post: | ||
amentfan322 (05-06-2009), braden (05-28-2009), nscarlcamp (05-07-2009), Rico Suave (05-07-2009), SLOCONDR (05-07-2009), TFB (05-06-2009) | ||
|
|||
|
I LOVE it when I get called to be an engineer on a remote job. There is such low expecetations on how much work can be done that we end up doing very little. Come on, 15 car cuts? we used to bang out 60 or 70 car cuts and had fun doing it.
|
|
|||
|
HERES ONE YOU CUT THE ENGINEER OFF ADD ABRAKEMAN TO THE JOB AND PRODUCTION GOES DOWN BECAUSE THE REMOTE ONLY MAKES ONE MOVE PER SHIFT BECAUSE THEY TAKE MORE TIME (AFTER YOU DO YOUR JOB BRIEFING REMOTE TEST ETC) AND ONE MAN OFF THE CREW STILL SETS IN THE SEAT OF THE LOCOMOTIVE TO PROTECT SHOVE MOVE AND ONE MAN IS ON GROUND STILL DOING ALL THE WORK BUT HEO OR SHE IS NOW MAKING MORE THAN THE ENGINEER ON THE BASIC DAY. I REALLY DONT UNDERSTAND A COMPANY WHO WANTS TO PAY MORE AND GET LESS WORK DONE. I GUESS THE BEAN CONTERS DID NOT SEE THIS ONE COMING
|
| The Following 2 Users Say Thank You to PE987654 For This Useful Post: | ||
amentfan322 (05-12-2009), Mistah (05-13-2009) | ||
|
||||
|
I think the remotes are just a way of running the yards in the ground so they can sell the yards to contractors
|
| The Following 2 Users Say Thank You to santafe engineer For This Useful Post: | ||
amentfan322 (05-19-2009), Hog&Tow (06-11-2009) | ||
|
|||
|
they just installed the puck system in acca, now when the engine gets 300 feet from the sigle it moves at a snails pace, great, just how much slower can we make this crap.
|
| The Following User Says Thank You to Jim Rockford For This Useful Post: | ||
Amtkhog (05-27-2009) | ||
|
|||
|
the slower the better
|
|
||||
|
Quote:
|
| The Following 2 Users Say Thank You to cornhusker For This Useful Post: | ||
amentfan322 (05-29-2009), Hog&Tow (06-11-2009) | ||
|
||||
|
The loss of the engineer at the head end was not just one of speed on the job, it also took away a valuable resource for new switchmen. The railroads seem to think it's a good idea to hire a bunch of new folk who have never switched a day in their lives AND give them control of a locomotive all in one fell swoop. If the RR would let the real railroaders to their job and lose the remotes we would again have a system in place for newhires to learn from the older conductors/switchmen and engineers on a full crew. Car counts would go up and yard derailments would go down. If it ain't broke, don't fix it.
HH |
| The Following User Says Thank You to HOOK'EMHORNS For This Useful Post: | ||
Hog&Tow (08-14-2009) | ||
| Bookmarks |
| Tags |
| control, failure, railroads, remote |
| Thread Tools | |
|
|