HOME REGISTER FORUM FAQ MEMBER LIST CALENDAR Search Today's Posts Mark Forums Read


Go Back   YardLimits.com > General Category > Frontpage Articles

Frontpage Articles Articles and discussion from the Yardlimits frontpage

Reply
 
LinkBack Thread Tools Display Modes
Old 10-13-2008, 01:01 PM   #1 (permalink)
Zeb
Armed and Dangerous

 
Zeb's Avatar
 

Join Date: Aug 2007
Location: Kansas City
Posts: 2,896
Thanks: 39
Thanked 540 Times in 264 Posts
Blog Entries: 14
Zeb has a reputation beyond reputeZeb has a reputation beyond reputeZeb has a reputation beyond reputeZeb has a reputation beyond reputeZeb has a reputation beyond reputeZeb has a reputation beyond reputeZeb has a reputation beyond reputeZeb has a reputation beyond reputeZeb has a reputation beyond reputeZeb has a reputation beyond reputeZeb has a reputation beyond repute
Four major railroads agree on PTC standards

By Progressive Railroading

With the Rail Safety Improvement Act of 2008 (H.R. 2095/S. 1889) just a presidential signature away from becoming law, four Class Is already are taking action to comply with the legislation's positive train control (PTC) mandates, Progressive Railroading magazine reports.
The four reached an agreement on PTC interoperability standards while two of them announced plans to begin implementing the technology in the Los Angeles area.

The bill will require all Class Is and passenger railroads to implement a PTC system on all mainlines where freight, intercity passenger and commuter trains operate, as well as on lines used to haul hazardous materials by Dec. 31, 2015.

A predictive collision avoidance system, PTC is designed to stop a train before an accident occurs, and keep a train within authorized limits and under the maximum speed.

One of the major obstacles facing Class Is as they work to meet the mandate is the interoperability of various PTC systems among various large roads and passenger railroads that share tracks. To that end, BNSF Railway Co., CSX Transportation, Norfolk Southern Corp. and Union Pacific Railroad have announced they reached the pact on PTC interoperability standards.

"While we have worked diligently to address the technical challenges of developing a deployable system, interoperability among railroads has remained a challenge," said NS Vice Chairman and Chief Operating Officer Stephen Tobias in a prepared statement. "This agreement has put us on a fast track to realizing the benefits of PTC."

The Class Is plan to work with elected officials and regulators to gain additional radio spectrum and establish sufficient communications for PTC, especially in L.A. and Chicago, said UP Executive Vice President of Operations Dennis Duffy.

Meanwhile, UP is pursuing its own plan to implement PTC on lines it shares with commuter railroads in the L.A. area by 2012. On Sept. 12, UP and Metrolink trains collided in Chatsworth, Calif., after the Metrolink engineer allegedly ran his train through a red signal.

UP plans to test its version of PTC, the Vital Train Management System (VTMS), on its lines in Iowa, Nebraska and Wyoming, and in Washington and Idaho as part of a joint test with Canadian Pacific Railway.

The Class I already has started to test VTMS — a system developed by Wabtec Railway Electronics that’s designed to override the engineer or train operator when necessary — on 456 miles of track. The tests will further validate the system's hardware and software, said Duffy.

"A metropolitan area such as L.A. presents unique operational and technical requirements, such as the high volume of radio spectrum needed and shared lines between freight and passenger trains," he said.

BNSF also plans to install its version of PTC on L.A.-area lines by 2012's end.

"BNSF has had a plan in place for implementation of PTC over many of the routes specified in the legislation," said BNSF EVP and COO Carl Ice. "We will be able to accelerate that plan to meet the statutory deadline and, if financing is available, may be able to implement PTC sooner in specific parts of our system, such as those where commuter rail service operates."

Since 2003, the Class I has been working with Wabtec Railway Electronics to develop the Electronic Train Management System (ETMS), which is designed to enforce train movement authorities, signal aspects, speed restrictions and work zones, and monitor switch position in non-signaled territory.

BNSF has tested ETMS on a 135-mile line in Illinois and continues to test the system between Fort Worth, Texas, and Oklahoma City, Okla. ETMS has "passed every test during more than 1,600 train trips made so far, [and] has stopped every train that it should have stopped, and not stopped any train that it should not have stopped," BNSF officials said.

The Class I has Federal Railroad Administration approval to implement ETMS on a test basis under certain conditions. ETMS tests on multiple-track mainlines shared by freight and passenger trains are under way, BNSF said.
__________________
Some drink at the fountain of knowledge. Others just gargle.


Zeb is online now  
Digg this Post!Add Post to del.icio.usBookmark Post in TechnoratiFurl this Post!
Reply With Quote
Old 10-13-2008, 01:40 PM   #2 (permalink)
Member
 
VITO's Avatar
 

Join Date: Jul 2008
Posts: 284
Thanks: 30
Thanked 62 Times in 49 Posts
VITO will become famous soon enough
PTC not withstanding it always amazes me when a C.E.O of any company makes a statement. "WE HAVE DILIGENTLY WORKED ON PTC" or whatever. I am waiting for a Chief Exc to say
" IN ORDER TO MINIMIZE THE MAXIMIZE WE FOUND IT NECESSARY TO MAXIMIZE THE MINIMIZE" Those collage degrees come in handy I guess.
VITO is offline  
Digg this Post!Add Post to del.icio.usBookmark Post in TechnoratiFurl this Post!
Reply With Quote
Old 10-13-2008, 02:40 PM   #3 (permalink)
we report..you decide
 
Hog&Tow's Avatar
 

Join Date: Feb 2008
Location: Texas
Posts: 3,378
Thanks: 1,153
Thanked 706 Times in 447 Posts
Hog&Tow has a reputation beyond reputeHog&Tow has a reputation beyond reputeHog&Tow has a reputation beyond reputeHog&Tow has a reputation beyond reputeHog&Tow has a reputation beyond reputeHog&Tow has a reputation beyond reputeHog&Tow has a reputation beyond reputeHog&Tow has a reputation beyond reputeHog&Tow has a reputation beyond reputeHog&Tow has a reputation beyond reputeHog&Tow has a reputation beyond repute
Quote:
Originally Posted by VITO View Post
PTC not withstanding it always amazes me when a C.E.O of any company makes a statement. "WE HAVE DILIGENTLY WORKED ON PTC" or whatever. I am waiting for a Chief Exc to say
" IN ORDER TO MINIMIZE THE MAXIMIZE WE FOUND IT NECESSARY TO MAXIMIZE THE MINIMIZE" Those collage degrees come in handy I guess.
B.S.= Bull Shit - M.S.= More Shit - P.H.D.= Piled Higher & Deeper.
__________________
always carry plenty to eat,plenty to read & a coat that makes a pillow.
Hog&Tow is offline  
Digg this Post!Add Post to del.icio.usBookmark Post in TechnoratiFurl this Post!
Reply With Quote
Old 10-14-2008, 10:58 PM   #4 (permalink)
BNSF PHALLUS
 
Popeye's Avatar
 

Join Date: Jan 2008
Location: SD 44
Posts: 4,054
Thanks: 340
Thanked 262 Times in 171 Posts
Popeye has much to be proud ofPopeye has much to be proud ofPopeye has much to be proud ofPopeye has much to be proud ofPopeye has much to be proud ofPopeye has much to be proud ofPopeye has much to be proud ofPopeye has much to be proud ofPopeye has much to be proud ofPopeye has much to be proud of
PTC was tested here in a very short run. It failed miserably. I am informed that ptc does not require signals. My question is how can an Engineer handle his train without signals? Maybe signals are displayed on the computer screen.
__________________
Thomas Jefferson said:
Quote:
"The democracy will cease to exist when you take away from those who are willing to work and give to those who would not."
Popeye is online now  
Digg this Post!Add Post to del.icio.usBookmark Post in TechnoratiFurl this Post!
Reply With Quote
Old 10-15-2008, 08:44 AM   #5 (permalink)
Member
 
jcmark611's Avatar
 

Join Date: Aug 2008
Posts: 29
Thanks: 0
Thanked 7 Times in 4 Posts
jcmark611 will become famous soon enough
Quote:
Originally Posted by Popeye View Post
PTC was tested here in a very short run. It failed miserably. I am informed that ptc does not require signals. My question is how can an Engineer handle his train without signals? Maybe signals are displayed on the computer screen.
PTC also works in Dark Territory as well as signaled territory. In the case of Dark Territory the PTC keeps trains from overrunning their track warrants. A line with PTC will have all switches, mileposts and station sign's GPS location inputted into the central computer. It should also be noted that the new regs are going to require switch monitoring & warning devices for dark territory (with speeds over a limit to be determined later).

Some versions of PTC will have a "heads up display" on the computer screen which will show approaching signals, end of authority limits and other trains.
jcmark611 is offline  
Digg this Post!Add Post to del.icio.usBookmark Post in TechnoratiFurl this Post!
Reply With Quote
The Following 2 Users Say Thank You to jcmark611 For This Useful Post:
nsrlink (10-15-2008), Popeye (10-15-2008)
Old 10-15-2008, 09:00 AM   #6 (permalink)
BNSF PHALLUS
 
Popeye's Avatar
 

Join Date: Jan 2008
Location: SD 44
Posts: 4,054
Thanks: 340
Thanked 262 Times in 171 Posts
Popeye has much to be proud ofPopeye has much to be proud ofPopeye has much to be proud ofPopeye has much to be proud ofPopeye has much to be proud ofPopeye has much to be proud ofPopeye has much to be proud ofPopeye has much to be proud ofPopeye has much to be proud ofPopeye has much to be proud of
I remember in Hog school, the monitor displayed the territory, with the track displayed ahead, as well as behind. BNSF has had years to develop computer generated track display. Now it's time to put it to use.
__________________
Thomas Jefferson said:
Quote:
"The democracy will cease to exist when you take away from those who are willing to work and give to those who would not."
Popeye is online now  
Digg this Post!Add Post to del.icio.usBookmark Post in TechnoratiFurl this Post!
Reply With Quote
Old 10-15-2008, 12:29 PM   #7 (permalink)
Super Moderator

 
Ghostrider's Avatar
 

Join Date: Aug 2007
Location: Over taxed state of Nebraska
Posts: 4,310
Thanks: 788
Thanked 485 Times in 282 Posts
Blog Entries: 1
Ghostrider has a reputation beyond reputeGhostrider has a reputation beyond reputeGhostrider has a reputation beyond reputeGhostrider has a reputation beyond reputeGhostrider has a reputation beyond reputeGhostrider has a reputation beyond reputeGhostrider has a reputation beyond reputeGhostrider has a reputation beyond reputeGhostrider has a reputation beyond reputeGhostrider has a reputation beyond reputeGhostrider has a reputation beyond repute
Popeye for years now the MOW vehicles that are GPS equipped have been mapping all of the system. You'll see the tags on switches ect around the systems. This data is correlated to the main computer data bases and therefore your train computers get the info from I believe the LARS system which has been in place on most road motors for at least 10 years. I may be wrong on the LARS term but if you look on the nose of most new GE's theres a sticker near the from that has the global satellite symbol.
__________________
An armed society is a polite society.

IF THE GOVERNMENT CAN'T TRUST US WITH GUNS
WHY SHOULD WE TRUST THE GOVERNMENT?!
Ghostrider is offline  
Digg this Post!Add Post to del.icio.usBookmark Post in TechnoratiFurl this Post!
Reply With Quote
Reply

Bookmarks

Tags
agree, major, ptc, railroads, standards

Thread Tools
Display Modes

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is On
Trackbacks are On
Pingbacks are On
Refbacks are On
Forum Jump


All times are GMT -5. The time now is 06:21 PM.

Powered by vBulletin® Version 3.7.3
Copyright ©2000 - 2009, Jelsoft Enterprises Ltd.
Copyright ©1997 - 2008, YardLimits.com